Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon Sep 16 11:58:20 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Filters:

Page#    2 Blog Entries  
Rail News
206118 views
2

Dec 20 2023 (09:47)   Railway Ministry Criticized for Delay in Establishing South Coast Railway Zone

NaagendraV   46 news posts
Entry# 5916734   News Entry# 534521         Tags   Past Edits
Visakhapatnam: జోన్‌ ఏర్పాటులో రైల్వేశాఖ తాత్సారం

The Lok Sabha Committee on Assurances has criticized the Ministry of Railways for their negligence in establishing a South Coast Railway zone headquartered in Visakhapatnam. The Committee expressed strong disapproval of the Railway Ministry's stance on the matter in a report submitted to the Parliament on Tuesday. The Railway Minister,...
more...
in response to questions raised by Andhra Pradesh MPs in the Lok Sabha regarding the establishment of the South Coast Railway zone and the Rayagada division in March 2020, February 2021, and March 2021, stated that a DPR had been prepared and was under consideration by the Railway Board. Consequently, a specific timeline could not be provided. After reviewing the implementation of this assurance, the Committee strongly criticized the Railway Ministry's actions over the past three years, citing significant delays in the establishment of the South Coast Railway zone and the Rayagada division. The Committee acknowledged that the DPR was still under review by the Ministry and that it would take some time to finalize. However, the Committee found the delays unacceptable, considering the importance of the assurance. They attributed the delay to negligence on the part of the Railway Ministry. The Committee expressed dissatisfaction with the Ministry's response regarding the closure of the Waltair division and recommended that the Ministry should have consulted with representatives and stakeholders to address the issue. The Committee emphasized that the establishment of the railway zone was a matter of importance to all members, regardless of their political affiliations. While acknowledging the challenges in completing infrastructure projects within a set timeframe, the Committee emphasized that the Railway Ministry's lack of effort in fulfilling assurances was evident. They urged the Ministry to work in coordination with all parties to implement the assurances and finalize a timeline for the establishment of the Rayagada division, which would contribute to industrial, social, and economic development in the region.

Lok Sabha Committee on Assurances ne Visakhapatnam mein South Coast Railway zone banane mein Railway Ministry ki laaparvahi par aaksep kiya hai. Committee ne Tuesday ko Parliament mein submit kiya gaya report mein Railway Ministry ke is matter par attitude ko strongly reject kiya. March 2020, February 2021 aur March 2021...
more...
mein Lok Sabha mein Andhra Pradesh ke MPs ne South Coast Railway zone aur Rayagada division banane ke baare mein pooche gaye sawaalon ka jawab dete hue, Railway Minister ne kaha tha ki DPR taiyaar ho gayi hai aur yeh Railway Board ke consideration mein hai. Isliye koi specific timeline nahi bataya ja sakta. Is assurance ke implementation ki review karne ke baad, Committee ne last three saalon mein Railway Ministry ke actions ko strongly reject kiya. Committee ne kaha ki South Coast Railway zone aur Rayagada division banane mein bahut der ho rahi hai. Committee ko pata hai ki DPR abhi bhi Ministry ke review mein hai aur isko finalize hone mein thoda time lagega. Lekin Committee ne is delay ko un acceptable maana hai, considering the importance of the assurance. Unhone yeh delay Railway Ministry ki negligence ke karan bataya. Committee ne Ministry ke Waltair division ke closure ke baare mein response se dissatisfaction dikhayi aur suggest kiya ki Ministry ko is issue ko address karne ke liye representatives aur stakeholders se consult karna chahiye tha. Committee ne yeh bhi kaha ki railway zone ka establishment sabhi members ke liye important hai, chahe woh kisi bhi party se belong karte ho. Infrastructure projects ko set timeframe mein complete karne ki challenges ko accept karte hue, Committee ne yeh bhi kaha ki Railway Ministry ki assurance ko pura karne mein lack of effort saaf dikh raha hai. Unhone Ministry se urge kiya ki woh assurances ko implement karne ke liye aur Rayagada division ke establishment ke liye timeline finalize karne ke liye sabhi parties se coordinate kare, jisse region mein industrial, social aur economic development ho sake.

Rail News
202989 views
1

Dec 20 2023 (09:49)
NaagendraV
NaagendraV   386 blog posts
Re# 5916734-1               Past Edits
1 compliments
Great
article source :

విశాఖపట్నం కేంద్రంగా దక్షిణకోస్తా రైల్వేజోన్‌ ఏర్పాటులో మంత్రిత్వశాఖ నిర్లక్ష్యధోరణితో వ్యవహరిస్తున్నట్లు లోక్‌సభ హామీల కమిటీ ఆక్షేపించింది.

తీసుకున్న
...
more...
చర్యలు సంతృప్తికరంగా లేవుపార్లమెంటు హామీల కమిటీ ఆక్షేపణనిర్దిష్ట గడువుతో కూడిన కార్యాచరణ అమలుచేయాలని ఆదేశం

ఈనాడు, దిల్లీ: విశాఖపట్నం (Visakhapatnam) కేంద్రంగా దక్షిణకోస్తా రైల్వేజోన్‌ (South Coast Railway zone) ఏర్పాటులో మంత్రిత్వశాఖ నిర్లక్ష్యధోరణితో వ్యవహరిస్తున్నట్లు లోక్‌సభ హామీల కమిటీ ఆక్షేపించింది. మంగళవారం సభకు సమర్పించిన నివేదికలో ఈ విషయంలో రైల్వేశాఖ వైఖరిని తీవ్రంగా తప్పుబట్టింది. దక్షిణకోస్తా రైల్వేజోన్‌, రాయగడ డివిజన్‌ ఏర్పాటు గురించి 2020 మార్చి, 2021 ఫిబ్రవరి, మార్చి నెలల్లో లోక్‌సభలో ఆంధ్రప్రదేశ్‌ సభ్యులు అడిగిన ప్రశ్నకు రైల్వేమంత్రి సమాధానమిస్తూ డీపీఆర్‌ తయారైందని, అది రైల్వేబోర్డు పరిశీలనలో ఉందని, అందువల్ల నిర్దిష్ట గడువు చెప్పలేమని పేర్కొన్నారు. ఈ హామీ అమలుపై అధ్యయనం చేసిన కమిటీ మూడేళ్లుగా రైల్వేశాఖ వ్యవహారశైలిని తీవ్రంగా తప్పుబట్టింది. ‘‘దక్షిణకోస్తా రైల్వేజోన్‌, రాయగడ డివిజన్‌ ఏర్పాటులో తీవ్ర జాప్యం జరిగినట్లు కమిటీ గుర్తించింది. ఈ సమస్య నిరంతరం కొనసాగుతోంది. డీపీఆర్‌ ఇప్పటికీ ఇంకా రైల్వే మంత్రిత్వశాఖ పరిశీలనలోనే ఉంది. దాని ఖరారుకు కొంత సమయం పడుతుందన్న విషయాన్ని కమిటీ అర్థం చేసుకుంది.

ఇంత ముఖ్యమైన హామీలో మూడేళ్లకు పైగా జాప్యాన్ని కమిటీ అంగీకరించట్లేదు. అది రైల్వే మంత్రిత్వశాఖ నిర్లక్ష్యాన్ని చాటుతోంది. వాల్తేరు డివిజన్‌ మూసివేత గురించి ప్రజాప్రతినిధులతో పాటు, వివిధ భాగస్వామ్యపక్షాలతో చర్చించి సమస్యను పరిష్కరించి ఉండాల్సింది. దీనిపై మంత్రిత్వశాఖ సమాధానంతో కమిటీ సంతృప్తి చెందడంలేదు. రైల్వేజోన్‌ అంశాన్ని పార్టీలతో సంబంధం లేకుండా సభ్యులంతా సభలోనూ, బయట ప్రస్తావిస్తున్నారు. మౌలికవసతుల పనులు నిర్దిష్ట గడువులోగా పూర్తిచేయడం కష్టమని కమిటీకి తెలుసు. ఇదే సమయంలో హామీలు నెరవేర్చడానికి రైల్వేశాఖ ప్రయత్నాలు చేయలేదన్నది నిజం. ఇప్పటికైనా రైల్వేశాఖ అన్ని పక్షాలతో సమన్వయం చేసుకొని, హామీల అమలుకు నడుం బిగించాలి. రాయగడ డివిజన్‌ ఏర్పాటుతో ఆ జిల్లాలో పారిశ్రామిక, సామాజిక, ఆర్థికాభివృద్ధి జరుగుతుంది. అందువల్ల రైల్వేశాఖ వెంటనే దక్షిణకోస్తా రైల్వేజోన్‌, రాయగడ డివిజన్‌ ఏర్పాటుకు నిర్దిష్ట గడువుతో కూడిన కార్యాచరణను తయారుచేసి అమలుచేయాలి’’ అని కమిటీ తన నివేదికలో పేర్కొంది.

#southcoastrailwayzone #bza #gnt #gtl #aprailwayinfra #ap_railway_infra #vskprailwayzone #andhra_railway_infra #SCOR

Translate to English
Translate to Hindi
Rail News
115281 views
4

IR Affairs
SCoR/South Coast
Dec 09 2023 (14:07)   SCoR Headquarters: DPR Approved, Land Acquisition Pending in Visakhapatnam

AdittyaaSharma^~   73505 news posts
Entry# 5906189   News Entry# 533165         Tags   Past Edits
1 compliments
Great
Project report for HQ of South Coast Railway Zone in Vizag ready: Centre

The Union Minister for Railways, Ashwini Vaishnaw, has confirmed that the Detailed Project Report (DPR) for the new South Coast Railway Zone (SCoR) has been prepared, and Rs 106.89 crore has been sanctioned for establishing its headquarters in Visakhapatnam. The East Coast Railway Zone has been tasked with land survey, layout...
more...
planning for the SCoR headquarters, residential colony, and other construction requirements. The DPR proposes establishing the headquarters on 52.2 acres in Mudasarlova, which the Greater Visakhapatnam Municipal Corporation (GVMC) is to provide in exchange for railway land used for the Bus Rapid Transit System (BRTS) project. However, the State government has yet to identify and hand over this land. Regarding the railway line between Visakhapatnam junction and Gopalapatnam, the minister stated that a double line connectivity already exists. In April 2023, work was sanctioned for the third and fourth lines on the 15.31-km stretch, at a cost of Rs 159.47 crore.

Railways ke Union Minister Ashwini Vaishnaw ne confirm kiya hai ki new South Coast Railway Zone (SCoR) ke liye Detailed Project Report (DPR) taiyar ho gaya hai, aur Visakhapatnam mein iske headquarters banane ke liye Rs 106.89 crore sanction kiya gaya hai. East Coast Railway Zone ko land survey, SCoR headquarters,...
more...
residential colony, aur other construction ke liye layout planning ka kaam diya gaya hai. DPR mein Mudasarlova mein 52.2 acres mein headquarters banane ka proposal hai, yeh land Greater Visakhapatnam Municipal Corporation (GVMC) Bus Rapid Transit System (BRTS) project ke liye liye gaye railway land ke badle mein dega. Lekin, State government ne abhi tak yeh land identify aur railways ko handover nahi kiya hai. Visakhapatnam junction aur Gopalapatnam ke beech railway line ke baare mein, minister ne bataya ki double line connectivity already hai. April 2023 mein, 15.31-km stretch mein third aur fourth lines ke liye kaam sanction kiya gaya, iska cost Rs 159.47 crore hai.

5 Public Posts - Sat Dec 09, 2023

45476 views
2

Dec 13 2023 (06:28)
NaagendraV
NaagendraV   386 blog posts
Re# 5906189-6               Past Edits
Adding more info:


GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
LOK SABHA UNSTARRED QUESTION NO. 625 TO BE ANSWERED ON 06.12.2023
...
more...

OPERATIONALISATION OF SOUTH COAST RAILWAY ZONE

625. SHRI RAM MOHAN NAIDU KINJARAPU:
Will the Minister of RAILWAYS be pleased to state:

(a) whether the Government has any plans to formally commence the operationalisation of the South Coast Railway Zone;

(b) the date on which the construction of a zonal headquarters at Visakhapatnam had started, the set completion date and the proposed extension of days for the completion of its construction and start of its working;

(c) the details regarding the funds for the aforementioned purposes that have been disbursed and utilised;

(d) whether the Government has a plan to construct a railway line between Visakhapatnam junction and Gopalapatnam, if so, the details thereof; and

(e) the details regarding the total area of land that has been acquired for the purpose of building the zonal headquarters at Visakhapatnam, including the issues that have come up during the acquisition of the same?

ANSWER
MINISTER OF RAILWAYS, COMMUNICATIONS AND ELECTRONICS & INFORMATION TECHNOLOGY

(SHRI ASHWINI VAISHNAW)
[

(a) to (e): A Statement is laid on the Table of the House. *****

STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (e) OF UNSTARRED QUESTION NO.625 BY SHRI RAM MOHAN NAIDU KINJARAPU TO BE ANSWERED IN LOK SABHA ON 06.12.2023 REGARDING OPERATIONALISATION OF SOUTH COAST RAILWAY ZONE

(a) to (e): Detailed Project Report (DPR) for the new South Coast Railway Zone (SCoR) has been prepared. The work of “Setting up of South Coast Railways’ Zone HQ” has been sanctioned at an estimated cost of Rs. 106.89 Crore. An outlay of Rs. 10 Crore has been provided for this work in 2023-24. East Coast Railway has been directed to take up suitable work for preliminary activities like land survey, preparation of complete layout plan of SCoR/Headquarter office complex, residential colony and other construction pre-requisites.
One of the options proposed in the Detailed Project Report for setting up of SCoR zone headquarter is in 52.2 Acre land at Mudasarlova which is to be handed over by Greater Visakhapatnam Municipal Corporation (GVMC)/Andhra Pradesh Government in lieu of railway land taken for Bus Rapid Transit System (BRTS) project. Government of Andhra Pradesh is yet to identify suitable 52.2 Acre land at Mudasarlova, Vishakhapatnam and hand it over to Railway.
There is existing double line connectivity between Visakhapatnam junction & Gopalapatnam. Further, work has been sanctioned for 3rd & 4th lines between Visakhapatnam junction & Gopalapatnam (15.31 km) in April, 2023 at a cost of Rs. 159.47 Crore.
*****

source :
click here

#SCOR #andhrarailinfra #andhra_railway_infra #BZA #GNT #VSKP #GTL #new_railway_zone #vskprailwayzone #AndhraRailwayInfra #southcoastalrailwayzone

Translate to English
Translate to Hindi

4 Public Posts - Fri Dec 15, 2023

5 Public Posts - Thu Dec 21, 2023
Page#    2 Blog Entries  

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

5968612 ★★★ 47ShivaankVaibhav~
6186110  15Rail_0326~
4948161 ★★★ 43SCoR~
3619297 ★★★ 399HBR^~
3368675 ★★★ 396mr.train_wala~
6007860 ★★★ 117RailwayFiles~
6186432 ★★★ 43PankajMishra^~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy