SB
2) Kalluru outer cabin -
#FirstSB3) Pole laid adjacent existing line
4) Ballast stacked near existing line
5) Land levelling has been done
6) Land levelling has been done and sleepers kept near levelled land
7) to 9) Sleepers and poles (without insulators) are laid for second line
10) Land levelling has been done
⏺️Khaderpet Railway Station
11) OHE portals
12) Pole with wire
⏺️Imampuram Railway Station
13) & 14) Poles without insulators
⏺️Between Imampuram - Venkatampalli
15) Track laid for second line and pole without insulators
16) Track laid for second line
17) Track laid for second line and pole without insulators
Pictures source: Self