Railway News Bilaspur: तीसरी लाइन का निरीक्षण, हरी झंडी मिलते ही दौड़ने लगेंगी ट्रेनेंA new 14.3 km long electrified third line between Singhpur, Shahdol, and Badhwabara has been completed under the South East Central Railway Bilaspur Division. This is part of a larger project to lay a 165.52 km electrified third line between Anuppur and Katni stations. The Safety Commissioner, B.K. Mishra, inspected the...
more... newly completed line and its infrastructure, including the station, yard, signaling equipment, and track. After a speed trial, the line will be opened for train operations if it passes the safety inspection. This will improve the efficiency and speed of train operations in the region.
Bilaspur Division mein, Anuppur aur Katni stations ke beech 165.52 km electrified third line bana rahe hain. Is project ka ek part, Singhpur, Shahdol, aur Badhwabara ke beech 14.3 km ki new electrified third line, ab complete ho gaya hai. Safety Commissioner, B.K. Mishra, ne is new line aur uske infrastructure...
more... ka inspection kiya. Unhone station, yard, signal equipment, aur track sab kuchh dekha. Speed trial ke baad, agar sab sahi rahega toh yeh line train operations ke liye khul jaayega. Isse train operations mein speed aur efficiency badhega.