Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun Sep 22 05:05:25 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6064016
Posted: May 15 (00:05)

No Responses Yet
Rail News
26243 views
2

IR Affairs
SR/Southern
May 15 (00:05)   Aroor Residents Raise Concerns Over Rail Track Doubling Project

DrAbhijay2407   380 news posts
Entry# 6064016         Tags   Past Edits
Rail-track doubling through Alappuzha: Land owners in Aroor demand a better due

Residents in Aroor are concerned about the impact of the second rail track construction, particularly the 20-ft high retention wall that will be built close to many houses and buildings. The Aroor-based Association of Rail Doubling Affected (ARDA) has raised several concerns, including lack of access to leftover land, blocked pathways...
more...
due to the wall, and the need for alternative routes. They also request relaxation in construction norms for those who have surrendered land for the second time. The Railway, however, maintains that only necessary land is acquired and that such demands often lead to litigation. The project, aiming for speedy completion, has divided the 69 km Ernakulam-Ambalappuzha corridor into three reaches. The Railway expects to complete land acquisition by 2024, followed by track laying which could take another two years.

Aroor mein rehne waale logon ko doosre rail track ke construction se pareshani ho rahi hai, khass kar ke 20-foot uncha retention wall jo kai gharon aur buildings ke paas banaya jaa raha hai. Aroor-based Association of Rail Doubling Affected (ARDA) ne kai baatein uthayi hain, jaise ki leftover land tak...
more...
pahunchne ki mushkil, wall ki wajah se pathways band ho jaana, aur alternative routes ki zarurat. Unhone aise logon ke liye construction norms mein relaxation ki bhi maang ki hai jinhone dusri baar apni zameen di hai. Railway ka kehna hai ki sirf zaruri zameen hi li jaati hai aur aise demands se aksar litigation hota hai. Project jaldi complete karne ke liye 69 km Ernakulam-Ambalappuzha corridor ko teen reaches mein divide kiya gaya hai. Railway ko ummeed hai ki land acquisition 2024 tak complete ho jaayega, uske baad track lay karne mein aur do saal lag sakte hain.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

4312546 ★★★ 282jishnuthakur12301^...
5650504 ★★★ 106jishnuthakur12301^...
5341825 ★★ 24SreeNdl^~
5595577 ★★★ 32RoyalIndianRailway...
6191858 ★★ 25SreeNdl^~
1959644 ★★★ 270Arpit~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy