COCR is a High speed trial run for the section upgrade. The main aim is to upgrade the speed of train from 110 to 130 in section.
This is done with the help of LHB rake consists of 24 coaches which includes all coach like 1ac 2nd ac, 3ac, Pantry car, Sleeper coach, Gen coach with EOG.
please wait...Translate to EnglishCOCR is like a speedy test run to make the trains go faster from 110 to 130. We're using a snazzy LHB train with 24 coaches - 1ac, 2nd ac, 3ac, pantry car, sleeper coach, general coach with EOG.